• Home
  • The Company
  • Testimonials
    • Wadlow Residence
    • Harvey Residence
    • Lake Park
    • Milepost 9
  • Subcontractors
    • Prequalification Form
    • Online Plan Center
  • Projects
    • Special Projects
    • General Contracting
    • Framing Division
  • Charitable
    • Extreme Makeover
    • Habitat for Humanity
    • Make-a-Wish
  • Safety
  • Current Projects
    • CDR Projects
  • Contact

Nickels Mixed Use

A0.1 Cover Sheet 

A1.0 General Information & Site Plan

A1.1 Landscape Buffer Plan

A2.0 Building Plans

A2.1 Building Plans

A2.2 Building Plans

A2.3 Building Plans

A2.4 Building Plans

A3.0 Unit A & B Plans

A3.1 Unit C Plans

A3.2 Unit C & D Plans

A5.0 Building Elevations

A5.1 Building Elevations

A6.0 Building Sections

A6.1 Wall Details

A7.0 Stair #01 Details

A7.1 Stair #02 Details

A8.0 Details

A9.0 Rated Penetration Details

A9.1 Rated Penetration Details

S1.0 General Structural Notes

S1.1 General Structural Notes

S2.0 Foundation Plan

S2.1 Foundation Plan

S2.2 Second Floor Framing Plan West

S2.3 Second Floor Framing Plan East

S2.4 Third Floor Framing Plan West

S2.5 Third Floor Framing Plan East

S2.6 Fourth Floor Framing Plan West

S2.7 Low Roof Framing Plan East

S2.8 Roof Framing West

S2.9 Roof Framing West

S3.0 Structural Details

S3.1 Structural Details

S3.2 Structural Details

S3.3 Structural Details

S3.4 Structural Details

C1

C2

C3

C4

C5


Home | The Company | Testimonials | Subcontractors | Projects | Charitable | Safety | Current Projects | Contact
© Copyright 2012 High Country Contractors